CRM for security system integrators.From site survey to commissioning.

CCTV, access control and low voltage teams quote equipment and installation together. Rekozo checks the margin on each quote, holds the deal until the site survey report is on file, and follows the order to commissioning.

DSCL
Access control, Dubai South warehouseChakan warehouse
Dubai South LogisticsChakan Logistics Park. Stage: Draft
Survey 3 of 4
Server roomOfficeRacking12345678910
DSL-Warehouse-B.pdfCustomer document, 10 of 16 doors marked
To move to Quote sent1 left
  • Site visit loggedRahul Menon, 05 Nov
  • Floor plan from the customerCustomer document
  • Door schedule, 16 doorsRevision 1
  • Site survey reportWaiting to be filed
Received attachments3 waiting to be filed
Survey_report_DSL.pdfSurvey_report_CLP.pdf
Email from Pradeep Kumar,09:40
File on deal
Gate_3_cabling.jpg
Email from Khalid Ansari,10:12
File on deal
Server_room_rack.jpg
Email from Khalid Ansari,10:13
File on deal
Quote Q-2026-0596Draft, 18 lines, AED 58,300.00INR 13,12,000.00Goes out when the survey report is filed
The survey report and photos arrive by email. File them on the deal, and the quote can go out.

Bring a site survey and its bill of materials to the demo. We will build the quote with you.

Book a demo

A pipeline from survey to commissioning.

The Technology resale pack creates these stages and the order stages through delivery to site and commissioning.

Pipeline
5 sales stages, 5 open deals
Business pack, chosen at setup
Technology resale13 stages
Renamed for your trade
  • SupplierVendor
  • Product codeSKU
Fields added
Manufacturer part noWarranty (months)Project reference
Draft1Draft
Dubai South LogisticsChakan Logistics ParkRM
AED 58,300INR 13,12,000
Survey report missing
Quote sent130% win
Al Noor FacilitiesSharma FacilitiesRM
AED 40,858INR 9,19,300
1 day in stage
Customer technical review145% win
Jumeirah Beach ResidencesJuhu Beach ResidencesPK
AED 126,400INR 28,44,000
Negotiation265% win
Sharjah Airport Free ZoneCochin Airport Free ZonePK
AED 214,900INR 48,35,000
Needs approval
Ajman UniversityNoida UniversityRM
AED 77,600INR 17,46,000
Tax changed
Order received1Won
Mirdif City CentreDwarka City CentreSA
AED 168,200INR 37,84,500
Order ORD-1231
After the win, the orderOrder stages from the same pack
  1. Order review
  2. PO confirmed
  3. Procurement
  4. Delivered to site
  5. Commissioned
  6. Invoice Sent
  7. Payment Received
  8. Complete

Hand to

Every won project reaches a site team.

A routing rule gives each new order a handler. Ops sees how many open orders each person holds, and any order can be handed to a colleague with a note.

Hand ORD-2210 to a colleague
Marina Heights OwnersGurugram Heights Owners. CCTV and access control, 64 cameras
Handler workloadOpen orders
JMJoseph Mathew4
PNPriya Nair6
AKAnil Kumar9
Note for Joseph

Cameras and the recorder are on site. Cabling can start on 16 Nov. The site contact is HassanHarpreet, gate 3.

Routing rule: DubaiDelhi NCR projects
Hand to Joseph
You are the handler for ORD-2210
Ravi Shankar handed the order to you. Just now

From the site survey to the handover.

Follow the CCTV project for Mirdif City Centre from the first site visit to commissioning.Follow the CCTV project for Dwarka City Centre from the first site visit to commissioning.

  1. 01Stage requirements

    The quote waits for the survey.

    Quote sent needs the site visit, the survey report and the consultant's drawings. The survey photos were filed from email.

    A quote sent before the survey is a quote you may need to change later. The requirement holds the deal until the site visit, the survey report and the drawings are on file. Survey photos that arrive by email wait in Received attachments until someone files them on the deal, so nobody searches an inbox for them.

    MCMirdif City CentreAED 168,200
    DraftQuote sent
    • Site visit logged04 Oct, Rahul Menon
    • Site survey reportFiled from email
    • Consultant drawingsRevision 4
    Ready to move3 of 3 in place
    DCDwarka City CentreINR 37,84,500
    DraftQuote sent
    • Site visit logged04 Oct, Rahul Menon
    • Site survey reportFiled from email
    • Consultant drawingsRevision 4
    Ready to move3 of 3 in place
  2. 02Quote from Excel

    The consultant's bill of quantities, priced.

    Upload a sheet of 100 lines or more. Rekozo prices each line from your catalog and shows the lines that still need a price.

    A bill of quantities from a consultant can have hundreds of rows. Rekozo prices the rows that match your catalog and lists the few that do not, such as the under vehicle scanner. Your estimator prices three lines, not 164.

    Quote from Excel
    Preview the priced lines, then create the quote
    BOQ_Mirdif_CC_ELV_Rev4.xlsx
    164 rows read, 296 KB
    164
    Lines
    161
    Priced
    3
    Need a price
    Needs a priceQty
    Turnstile, tripod, stainless steel4
    Under vehicle scanner1
    Fibre patch panel, 24 port6
    Quote from Excel
    Preview the priced lines, then create the quote
    BOQ_Dwarka_CC_ELV_Rev4.xlsx
    164 rows read, 296 KB
    164
    Lines
    161
    Priced
    3
    Need a price
    Needs a priceQty
    Turnstile, tripod, stainless steel4
    Under vehicle scanner1
    Fibre patch panel, 24 port6
  3. 03Order

    Follow the installation stage by stage.

    A won deal becomes an order with a handler. Readiness checks sit on the order, and each stage shows the next step.

    The project team works on the same order the sales team sold. Each stage shows what is done and what is still open, such as the cabling due on 19 Nov. The rep can answer the customer without a call to the site.

    Order ORD-1231
    Mirdif City Centre
    HandlerPKPradeep Kumar
    1. Order review
    2. PO confirmed
    3. Procurement
    4. Delivered to site
    5. Commissioned
    • Equipment deliveredDN-44120, 11 Nov
    • Civil works readyConfirmed by the customer
    • Cabling completeDue 19 Nov
    Stage owner: Pradeep KumarHand to
    Order ORD-1231
    Dwarka City Centre
    HandlerPKPradeep Kumar
    1. Order review
    2. PO confirmed
    3. Procurement
    4. Delivered to site
    5. Commissioned
    • Equipment deliveredDN-44120, 11 Nov
    • Civil works readyConfirmed by the customer
    • Cabling completeDue 19 Nov
    Stage owner: Pradeep KumarHand to
  4. 04Handover

    Commissioned, signed off and handed over.

    The customer signs the commissioning sheet. The as-built drawings go on the order, and the last payment is expected.

    The commissioning sign-off and the final drawings stay on the order, where anyone can find them later. The last 10% shows as an expected payment, so the final payment is not forgotten when the team leaves the site.

    Order ORD-1231
    Mirdif City Centre
    HandlerPKPradeep Kumar
    1. Order review
    2. PO confirmed
    3. Procurement
    4. Delivered to site
    5. Commissioned
    • Commissioning sign-offSigned by the customer, 21 Nov
    • As-built drawings and test sheetsFiled on the order
    • Final payment, 10%Expected 30 Nov
    Stage owner: Pradeep KumarHand to
    Order ORD-1231
    Dwarka City Centre
    HandlerPKPradeep Kumar
    1. Order review
    2. PO confirmed
    3. Procurement
    4. Delivered to site
    5. Commissioned
    • Commissioning sign-offSigned by the customer, 21 Nov
    • As-built drawings and test sheetsFiled on the order
    • Final payment, 10%Expected 30 Nov
    Stage owner: Pradeep KumarHand to
Mirdif City CentreDwarka City Centre
CCTV and access control, 96 cameras
Stage requirementsQuote from ExcelOrderHandover

Where Rekozo stops

Rekozo sells the system. Your other tools run the site.

Cameras and alarms stay in their own software. The invoice reference comes to Rekozo.

  • Rekozo does not monitor cameras or alarms.
Read the product overview

Stays in your systems

Monitoring and service software

Video, alarms and maintenance visits
  • Video monitoring and alarm receiving
  • Device management and service visits

Accounts system

Zoho Books, Tally or your ERP
  • Invoices, VAT and the booksInvoices, GST and the books

Kept in Rekozo

  • Sites, surveys and the documents each stage needs
  • Quotes with equipment, cabling and installation
  • The order through delivery to site and commissioning
ORD-1231
Mirdif City CentreDwarka City Centre
Invoice recorded
INV-2026-1288
Amount
AED 176,610.00INR 44,65,710.00
Invoice date
25 Nov

How it works in your business

A shopping centre in Dubai needs 96 cameras and access control. Here is the project in Rekozo, from the survey to the last payment.A shopping centre in Delhi needs 96 cameras and access control. Here is the project in Rekozo, from the survey to the last payment.

  1. The survey comes first

    The facilities team at Mirdif City Centre asks for a site survey through the enquiry form on your website. Rekozo creates a lead for the next person on your list, Rahul Menon. Rahul visits on 04 Oct and logs the visit. The survey report and photos arrive by email, and Rahul files them on the deal. With the consultant's drawings on file, the deal can move to Quote sent.The facilities team at Dwarka City Centre asks for a site survey through the enquiry form on your website. Rekozo creates a lead for the next person on your list, Rahul Menon. Rahul visits on 04 Oct and logs the visit. The survey report and photos arrive by email, and Rahul files them on the deal. With the consultant's drawings on file, the deal can move to Quote sent.

  2. The bill of quantities becomes the quote

    The consultant sends revision 4 of the bill of quantities, and Rahul uploads the sheet. Rekozo prices 161 of the 164 rows from the catalog, and Rahul prices the last three. If the margin is below your rule, the quote waits for a manager's approval before anyone can send the quote.

  3. The PO arrives and the order has a handler

    The customer sends the PO, and the deal moves to Order received. Order ORD-1231 is assigned to Pradeep Kumar, the handler, with the PO and the readiness checks. He moves the order through procurement and delivery to site.

  4. Commissioned, then paid

    The customer signs the commissioning sheet on 21 Nov. Accounts record invoice INV-2026-1288 from your accounts system. The final 10% is expected on 30 Nov, and Receivables shows the amount until the payment is recorded.

Questions buyers ask

What should a CRM for security integrators manage?
The site and its contacts, the survey, a quote that holds equipment and installation with its cost, approvals for low margins, the installation order and the maintenance renewal.
Can one quote hold cameras, cabling and installation?
Yes. A quote mixes equipment, cabling, licences and services. Each line carries its cost, so the margin shows on the whole quote.
Can a deal wait for the site survey?
Yes. A stage requirement can hold a deal until the survey report is on file or the site visit is logged.
Does Rekozo monitor cameras or alarms?
No. Monitoring, alarm receiving and device management stay in their own software. Rekozo manages the sale and the order.
What if the customer adds cameras after the order?
The rep or the handler changes the lines on the order. If your company rule asks for confirmation, a price change waits for the customer's confirmation, such as a revised PO or a reference, and the rep gets a reminder task. Every change is kept in the Amendments log.
Can site engineers see our vendor cost?
Only if you give them the permission. Seeing cost is a permission on each role, and a person without the permission receives no cost or margin from the server. Your order team can have a separate permission to see cost on won orders only, without the margin on open deals.

Bring one real quote to the demo.

We will build the quote in Rekozo with you, with your margin rule and your tax.

Or start a free trial for 30 days. Every feature, up to 5 users.